Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Benoist Farms Rd ' (1) ·
'CITRUS BLVD. ' (1) ·
'E/B Atlantic Ave. ' (1) ·
'EB SR 70 ' (1) ·
'Hanley Rd. S 25th ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Orange camp Rd. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 70 EB ' (1) ·
'SR 710 ' (1) ·
'SR A1A ' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'W/B Atlantic Ave ' (1) ·
US-1 (1)
700224 (1) ·
790211 (1) ·
894060 (1) ·
930437 (1) ·
930440 (1) ·
930508 (1) ·
930509 (1) ·
930534 (1) ·
931006 (1) ·
934711 (1) ·
940154 (1) ·
940156 (1) ·
940158 (1) ·
944016 (1)
'0.25mi. east of I-95 ' (1) ·
'0.2MILE S OF SW BECKER RD' (1) ·
'0.6 mile South of SR 882 ' (1) ·
'1.1 Mile S of CR-611B ' (1) ·
'3.9 MI W of FL Tpk SR 91 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'7 MI W of FL TPK SR91 ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
US-1 over Sebastian River (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)