Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Avenue ' (1) ·
'Belvedere Road ' (1) ·
'Burns Road ' (1) ·
'C-51 CANAL ' (1) ·
'C-52 Canal ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'FL TPK (SR-91) ' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'LWDD E-2E Canal ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'SW 10th St. Lowson Blvd ' (1) ·
Sawgrass Creek (1) ·
St Johns River (1) ·
St Johns River Relief (1) ·
St. Johns River (1)
'CLINT MOORE RD EB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'LYONS ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R.9) ' (1) ·
'PBIA Rp to NB I-95' (1) ·
'Roebuck Road ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR-60 EB ' (1) ·
US-192 EB (1) ·
US-192 WB (1)
700212 (1) ·
700213 (1) ·
700214 (1) ·
700215 (1) ·
880091 (1) ·
930479 (1) ·
930483 (1) ·
930486 (1) ·
930487 (1) ·
930494 (1) ·
930498 (1) ·
930500 (1) ·
930501 (1) ·
930518 (1) ·
930521 (1) ·
934283 (1) ·
934731 (1) ·
934969 (1)
'0.5 mi N of Atlantic Ave ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.0 Mi West of Haverhill ' (1) ·
'1.5 miles South of SR 806' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'Between N Lake/PGA Blvds ' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'I 95 Over Lowson Blvd ' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB Ramp to WPB Airport ' (1) ·
US-192 EB-St Johns Relief (1) ·
US-192 EB-St Johns River (1) ·
US-192 WB - Sawgrass Cr. (1) ·
US-192 WB- St Johns River (1)
10000 (1) ·
101541 (1) ·
104500 (1) ·
114500 (1) ·
12200 (1) ·
14878 (1) ·
20647 (1) ·
4400 (1) ·
5300 (1) ·
5800 (1) ·
6174 (1) ·
85750 (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10063 (1) ·
10712 (1) ·
148776 (1) ·
17350 (1) ·
176174 (1) ·
181308 (1) ·
198658 (1) ·
21167 (1) ·
24776 (1) ·
25813 (1) ·
7634 (1) ·
9196 (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)