Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'CANAL E-2-E(BOYN BC INT)' (1) ·
'CANAL E-2-W(BOYN BC INT)' (1) ·
'Casa Mar Dr ' (1) ·
'CSX RR ' (1) ·
'El Rio Canal ' (1) ·
'FL. TURNPIKE ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'L-5 Canal ' (1) ·
'Lake Ida Canal E-4 ' (1) ·
'Lateral "B" Canal ' (1) ·
'Lateral B Canal ' (1) ·
'Over D Canal ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'US 98-SR 80-WPB Canal ' (1)
'4th Street ' (1) ·
'CR-606 Oslo Rd ' (1) ·
'E Gateway Blvd ' (1) ·
'EBSR80 to SBSR807 ' (1) ·
'HOOD RD 110.944 ' (1) ·
'I 95 SR 9 ' (1) ·
'Levee Road ' (1) ·
'Lyons Rd ' (1) ·
'SBSR807 to EBSR80 ' (1) ·
'Spanish River Blvd' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR91 NB TPK 86.69 ' (1) ·
'SR91 NB TPK 86.88 ' (1) ·
'SR91 SB TPK 86.85 ' (1) ·
'SR91 SB TPK 87.213' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'Tangerine Drive ' (1) ·
'WB Forest Hill Bld' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
884071 (1) ·
884074 (1) ·
930429 (1) ·
930430 (1) ·
930431 (1) ·
930432 (1) ·
930433 (1) ·
930441 (1) ·
930450 (1) ·
930472 (1) ·
930473 (1) ·
930490 (1) ·
930514 (1) ·
930800 (1) ·
930804 (1) ·
931004 (1) ·
934945 (1) ·
934946 (1) ·
934954 (1) ·
935222 (1)
'1.5 mile North of SR 804 ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'2.2MI N of Boynton Bch Bl' (1) ·
'2.7 miles N of SR 806 ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'At CR-613 ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'SE quadrant PB Int Airprt' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)