Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER C-25 CANAL ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'CANAL C-24 ' (1) ·
'Canal No. 1 ' (1) ·
'Canal No.1 ' (1) ·
'E-1 Canal ' (1) ·
'Hillsboro (L-14) Canal ' (1) ·
'I-4 ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-6 Canal ' (1) ·
'LWDD LAT. 38 CANAL ' (1) ·
'MAPLE CREEK ' (1) ·
'Rose Bay ' (1) ·
'SFC CANAL NO 1 ' (1) ·
'Spruce Creek ' (1) ·
'Spruce Creek N Relief ' (1) ·
'Spruce Creek S. Relief ' (1) ·
'SR-710 ' (1) ·
'Tomoka River ' (1)
'CONGRESS AVE ' (1) ·
'Hypoluxo Rd ' (1) ·
'KEENE ROAD/CR-611 ' (1) ·
'LYONS ROAD ' (1) ·
'MAPP RD ' (1) ·
'NB SR-615 ' (1) ·
'SB SR- 615 ' (1) ·
'SOUTH BEND BLVD. ' (1) ·
'SR-472 WB ' (1) ·
'SR-715 ' (1) ·
'SR-807 Congress Av' (1) ·
'U.S.-1 (SR-5) ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-1SB ' (1) ·
'W LAKE RD CR-717 ' (1) ·
'WB PGA Blvd. ' (1)
790155 (1) ·
790157 (1) ·
790159 (1) ·
790162 (1) ·
790186 (1) ·
790190 (1) ·
894033 (1) ·
930349 (1) ·
930466 (1) ·
930470 (1) ·
930471 (1) ·
934362 (1) ·
934491 (1) ·
934505 (1) ·
934956 (1) ·
940148 (1) ·
940149 (1) ·
944014 (1) ·
945251 (1)
'0.2MI S OF FLORESTA DR ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1.0mile south of SR-80 ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'2 mi N. of SR 68 ' (1) ·
'2 Mi. N. of SR 68 ' (1) ·
'At ANGLE RD(CR-607A) ' (1) ·
'AT SR-7 & Hypoluco Rd ' (1) ·
'Belle Glade 1Mi W SR-80 ' (1) ·
'Port of Palm Beach ' (1) ·
'SR-472 WB over I-4 ' (1) ·
'US-1 NB - Tomoka River ' (1) ·
'US-1 NB over Rose Bay ' (1) ·
'US-1 SB - Spruce Creek ' (1) ·
'US-1 SB-Spruce Creek ' (1) ·
'US-1SB - Spruce Cr. S. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)