Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'CANAL C-108 ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'Deep Ck. Diversion Cnl ' (1) ·
'DRAINAGE CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'EPB CANAL C-3 ' (1) ·
'Indian River IWW ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'KRUEGER CREEK ' (1) ·
'Lake Ashby Canal ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'Tillman Canal ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'CR-712 (MIDWAY RD)' (1) ·
'CR-880 ' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'JORGENSEN RD ' (1) ·
'JUPITER BEACH RD ' (1) ·
'LE CHALET BLVD ' (1) ·
'LINTON BLVD. ' (1) ·
'Maytown Road ' (1) ·
'Minton Road CR-509' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NORTH MACEDO BLVD ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'PROSPERITY FARMSRD' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SELVITZ RD. ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SW 18TH ST ' (1) ·
'US-192 EB ' (1)
700181 (1) ·
704075 (1) ·
794139 (1) ·
794141 (1) ·
890107 (1) ·
890120 (1) ·
930322 (1) ·
930351 (1) ·
930373 (1) ·
934125 (1) ·
934135 (1) ·
934487 (1) ·
934905 (1) ·
934940 (1) ·
935218 (1) ·
940035 (1) ·
940111 (1) ·
940112 (1) ·
945252 (1) ·
945253 (1) ·
945254 (1)
'.75 miles South of SR-882' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.2MI N OF NW BAYSHORE BL' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.2MI S OF N MACEDO BLVD.' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5MI W OF NW ST JAMES DR' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1MI W of US-1 ' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'2MI E of SR-76 ' (1) ·
'3.5 miles East of SR-415 ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'4.8 miles East of SR-415 ' (1) ·
'I-95 over Midway Road ' (1) ·
'US-192 EB - Indian River ' (1)
26194915 (1) ·
26240578 (1) ·
26262317 (1) ·
26295449 (1) ·
26331032 (1) ·
26383999 (1) ·
26404182 (1) ·
26524856 (1) ·
26561862 (1) ·
27035280 (1) ·
27115100 (1) ·
27201582 (1) ·
27201586 (1) ·
27201587 (1) ·
27222697 (1) ·
27222772 (1) ·
27222932 (1) ·
28004932 (1) ·
28050237 (1) ·
28504614 (1) ·
28504680 (1)
80032221 (1) ·
80035475 (1) ·
80042000 (1) ·
80043160 (1) ·
80054858 (1) ·
80072029 (1) ·
80075125 (1) ·
80075212 (1) ·
80120021 (1) ·
80135670 (1) ·
80203293 (1) ·
80213056 (1) ·
80215969 (1) ·
80222500 (1) ·
80243196 (1) ·
80243677 (1) ·
80270492 (1) ·
80352939 (1) ·
80401977 (1) ·
81044532 (1) ·
81060638 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)