Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'BRANCH OF MIAMI CANAL ' (1) ·
'C STANLEY WEAVER CANAL ' (1) ·
'Drainage Ditch ' (1) ·
'E-3 CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'I-95 ' (1) ·
'ICWW ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-5 Canal ' (1) ·
'Lateral Canal A ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M-2 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'MANATEE POCKET ' (1) ·
'Misner Branch ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SCOTTS CANAL ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Sweetwater Creek ' (1) ·
'Sykes Creek ' (1) ·
'WARNER CREEK ' (1)
'CAMINO REAL ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'EB Lake Worth Rd. ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'HORSESHOE POINT RD' (1) ·
'ISLAND WAY ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'LOCKS ROAD ' (1) ·
'LPGA Blvd ' (1) ·
'Main Trail ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'MONET ROAD ' (1) ·
'NB US-27 SR-25 ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'PALMETTO PK RD ' (1) ·
'Port St. Lucie Bld' (1) ·
'SR-421 ' (1) ·
'SR-520 ' (1) ·
'SR-60 ' (1) ·
'SR-656 (17th St.) ' (1) ·
'TROPICALIA AVE. ' (1) ·
'Willowood Drive ' (1)
700193 (1) ·
704032 (1) ·
790171 (1) ·
790173 (1) ·
796000 (1) ·
880077 (1) ·
880087 (1) ·
880106 (1) ·
884056 (1) ·
890101 (1) ·
894044 (1) ·
894050 (1) ·
894052 (1) ·
930329 (1) ·
930353 (1) ·
934126 (1) ·
934240 (1) ·
934516 (1) ·
934902 (1) ·
934950 (1) ·
934960 (1) ·
936551 (1) ·
940142 (1)
'.21 E of Minton Rd. ' (1) ·
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'0.75 mi. E. of I-95 ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'250ft North of SR-60 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'Palm Beach - Broward Line' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'SR-60 East of 66 Ave ' (1)
26200920 (1) ·
26203857 (1) ·
26210226 (1) ·
26322054 (1) ·
26370804 (1) ·
26400360 (1) ·
26422645 (1) ·
26501416 (1) ·
26562485 (1) ·
26583556 (1) ·
27060944 (1) ·
27084791 (1) ·
27134072 (1) ·
27162224 (1) ·
27375640 (1) ·
27382059 (1) ·
27382201 (1) ·
27390707 (1) ·
28030000 (1) ·
28212603 (1) ·
29064881 (1) ·
29131187 (1) ·
29165358 (1)
80040825 (1) ·
80041914 (1) ·
80054960 (1) ·
80074511 (1) ·
80074852 (1) ·
80075632 (1) ·
80095067 (1) ·
80112778 (1) ·
80140376 (1) ·
80162515 (1) ·
80184167 (1) ·
80213032 (1) ·
80221680 (1) ·
80225301 (1) ·
80254872 (1) ·
80274947 (1) ·
80321860 (1) ·
80400400 (1) ·
80404702 (1) ·
80491520 (1) ·
81012996 (1) ·
81054109 (1) ·
81061122 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)