Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12254 (1) ·
12275 (1) ·
13721 (1) ·
13723 (1) ·
13724 (1) ·
13800 (1) ·
13816 (1) ·
15226 (1) ·
15232 (1) ·
15253 (1) ·
15668 (1) ·
15712 (1) ·
15796 (1) ·
15823 (1) ·
15992 (1) ·
15994 (1) ·
16003 (1) ·
16004 (1) ·
16054 (1) ·
16055 (1) ·
16057 (1) ·
16058 (1) ·
16059 (1) ·
16083 (1) ·
18767 (1) ·
19234 (1) ·
19535 (1) ·
19536 (1)
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'BESSEY CREEK ' (1) ·
'Canal ' (1) ·
'Danforth Creek ' (1) ·
'E-1 Canal ' (1) ·
'E-3 Canal ' (1) ·
'Halifax River IWW ' (1) ·
'Lake Ashby Canal ' (1) ·
'LIPTOG CANAL ' (1) ·
'LK OSBORNE DR&CENTER DR ' (1) ·
'M-1 CANAL ' (1) ·
'Melbourne-Tillman Canal ' (1) ·
'Navy Canal ' (1) ·
'Reed Canal ' (1) ·
'SR-68 ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'SR-9 (I-95) ' (1) ·
'St. Johns River ' (1) ·
'WPB WATER SUPPLY CANAL ' (1)
'6TH AVE SO. WB ' (1) ·
'Bellevue Ave ' (1) ·
'Berry Avenue ' (1) ·
'Emerson Drive ' (1) ·
'Graham Road ' (1) ·
'Lake Ashby Road ' (1) ·
'MURPHY RD ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'OKEECHOBEE RD. EB ' (1) ·
'Patti Drive ' (1) ·
'PINE RIDGE WAY ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR 614 (INDRIO-RD)' (1) ·
'SR-40 ' (1) ·
'SR-415 ' (1) ·
'SR-5A ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-808 Glades Road' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'WB SR - 714 ' (1)
704017 (1) ·
705906 (1) ·
790124 (1) ·
790132 (1) ·
790135 (1) ·
790249 (1) ·
794146 (1) ·
796500 (1) ·
890103 (1) ·
890112 (1) ·
890135 (1) ·
894054 (1) ·
930325 (1) ·
930401 (1) ·
934220 (1) ·
934302 (1) ·
937361 (1) ·
937363 (1) ·
937710 (1) ·
937711 (1) ·
937712 (1) ·
937714 (1) ·
940092 (1) ·
940093 (1) ·
940096 (1) ·
940097 (1) ·
940100 (1) ·
940137 (1)
'.75 MI. S. of US-92 ' (1) ·
'0.1 Mile S of CR-714 ' (1) ·
'0.2Mi W OF ROYAL P.B. BLV' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.6 MI E OF I-95 ON SR614' (1) ·
'0.6MI WEST OF I-95 ' (1) ·
'0.8MI S OF 45TH ST CR702 ' (1) ·
'1 mi North of Malabar Rd ' (1) ·
'15ft. N of Pine Island Dr' (1) ·
'1mi. N of SR-70/SR-9 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'200ft. East of SR-415 ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'40ft. E. of SR-5A ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'Just North of SR70 on I95' (1) ·
'SR-40 over IWW ' (1) ·
'SR-415 - St. Johns River ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-441 and SR-76 ' (1)
26220386 (1) ·
26220527 (1) ·
26363379 (1) ·
26422207 (1) ·
26433224 (1) ·
26435320 (1) ·
26435409 (1) ·
26440062 (1) ·
26440066 (1) ·
26445867 (1) ·
26590720 (1) ·
27093790 (1) ·
27102072 (1) ·
27112563 (1) ·
27254533 (1) ·
27264995 (1) ·
27265210 (1) ·
27281041 (1) ·
27281411 (1) ·
27311800 (1) ·
28004758 (1) ·
28293415 (1) ·
28480959 (1) ·
28563087 (1) ·
29092052 (1) ·
29112242 (1) ·
29113367 (1) ·
29171420 (1)
80043911 (1) ·
80052862 (1) ·
80053153 (1) ·
80053241 (1) ·
80060815 (1) ·
80074659 (1) ·
80121129 (1) ·
80133989 (1) ·
80134000 (1) ·
80135980 (1) ·
80161373 (1) ·
80170910 (1) ·
80175123 (1) ·
80231656 (1) ·
80233690 (1) ·
80233991 (1) ·
80252971 (1) ·
80254109 (1) ·
80262200 (1) ·
80370127 (1) ·
80384417 (1) ·
80425652 (1) ·
81005885 (1) ·
81015422 (1) ·
81020145 (1) ·
81030614 (1) ·
81060951 (1) ·
81123701 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 28 results in range #1 to #28.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)