Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C STANLEY WEAVER CANAL ' (1) ·
'CSX RR ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'I-95 ' (1) ·
'ICWW ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'M-2 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SCOTTS CANAL ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Sykes Creek ' (1) ·
'WARNER CREEK ' (1)
'CR-611 43RD AVE. ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'ISLAND WAY ' (1) ·
'LA MANCHA AVE. ' (1) ·
'LOCKS ROAD ' (1) ·
'LPGA Blvd ' (1) ·
'MADRID STREET ' (1) ·
'MONET ROAD ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'Port St. Lucie Bld' (1) ·
'SR 804 ' (1) ·
'SR-15 Main St. ' (1) ·
'SR-520 ' (1) ·
'SR-60 ' (1) ·
'TROPICALIA AVE. ' (1)
700193 (1) ·
790171 (1) ·
880087 (1) ·
884056 (1) ·
894044 (1) ·
894050 (1) ·
894052 (1) ·
930265 (1) ·
930267 (1) ·
930268 (1) ·
930289 (1) ·
930338 (1) ·
934240 (1) ·
934950 (1) ·
936551 (1) ·
937356 (1) ·
937359 (1) ·
940142 (1)
'0.1MI N of BILBAO ST. ' (1) ·
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'250ft North of SR-60 ' (1) ·
'At East Canal St. ' (1) ·
'Just West of I 95 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'Tpk/PGA Blvd interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)