Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'COLLIER WATERWAY ' (1) ·
'E3 CANAL ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'KELLER CANAL ' (1) ·
'Palmetto Park Road ' (1) ·
'RETENTION POND ' (1) ·
'ROEBUCK CREEK ' (1) ·
'Service Rd & Canal ' (1) ·
'SR-513 ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
'BELVEDERE ROAD ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CENTER DRIVE ' (1) ·
'DYER PARK ROAD ' (1) ·
'ENGLAR DRIVE ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'LAKE IDA ROAD ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'PERIWINKLE DRIVE ' (1) ·
'SR-401 NB ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-407 ' (1) ·
'SW 18th Street ' (1)
700083 (1) ·
700091 (1) ·
700117 (1) ·
700149 (1) ·
885601 (1) ·
885603 (1) ·
894051 (1) ·
930187 (1) ·
930188 (1) ·
930197 (1) ·
930198 (1) ·
930199 (1) ·
934140 (1) ·
934148 (1) ·
934149 (1) ·
934282 (1) ·
934357 (1) ·
934964 (1)
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.25 mi. N of County Line' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'Boca Raton ' (1) ·
'IN JOHN PRINCE PARK ' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)