Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'14TH STREET CANAL ' (1) ·
'C-18 Canal ' (1) ·
'CSX RAILROAD ' (1) ·
'Hidden Valley Canal C15 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-76 ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'Tomoka River ' (1)
'CR-603-IND RIV BLV' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PLM BEACH LAKES BL' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SR-76 ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'US-1 (SR-5) ' (1)
790077 (1) ·
790078 (1) ·
884054 (1) ·
890121 (1) ·
890122 (1) ·
890126 (1) ·
890127 (1) ·
890129 (1) ·
930006 (1) ·
930371 (1) ·
930372 (1) ·
930387 (1) ·
934908 (1) ·
937709 (1)
'.25 mi East of I-95 ' (1) ·
'.25mi W OF I-95 ' (1) ·
'0.1MI W OF DIXIE HIGHWAY ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'I 95 SR706 interchange ' (1) ·
'I-95 NB - Tomoka R. ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'No. City Line Boca Raton ' (1) ·
'South of Ramp to SR 706 ' (1) ·
'South of St Lucie Canal ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)