Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Alamana Canal ' (1) ·
'BESSEY CREEK ' (1) ·
'BRANCH OF ICWW ' (1) ·
'C STANLEY WEAVER CANAL ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'DRAINAGE CANAL ' (1) ·
'DRAINAGE DITCH ' (1) ·
'HUNGRYLAND CANAL C-18 ' (1) ·
'ICWW ' (1) ·
'Indian River ' (1) ·
'M-2 CANAL ' (1) ·
'PHIPP CANAL ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SCOTTS CANAL ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Sweetwater Creek ' (1) ·
'Sykes Creek ' (1)
'CR712 MDWYRD 150.3' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'LOCKS ROAD ' (1) ·
'MONET ROAD ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'Port St. Lucie Bld' (1) ·
'SR 91 TPK 120.25 ' (1) ·
'SR 91 TPK 137.25 ' (1) ·
'SR-415 ' (1) ·
'SR-421 ' (1) ·
'SR-520 ' (1) ·
'SR-60 ' (1) ·
'SR-710 ' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'SR91 N/S TPK 123.9' (1) ·
'SR91 N/S TPK 125.2' (1) ·
'SR91 N/S TPK 126.5' (1) ·
'SR91 N/S TPK 127.9' (1) ·
'SR91 N/S TPK 135.6' (1) ·
'SR91 N/S TPK 138.1' (1) ·
'SR91 N/S TPK 167.2' (1) ·
'SR91 TPK 134.1 ' (1)
700171 (1) ·
700193 (1) ·
790034 (1) ·
790173 (1) ·
880087 (1) ·
890067 (1) ·
890070 (1) ·
890073 (1) ·
890074 (1) ·
890075 (1) ·
890078 (1) ·
890082 (1) ·
890083 (1) ·
890085 (1) ·
894050 (1) ·
930121 (1) ·
930239 (1) ·
934126 (1) ·
934240 (1) ·
934950 (1) ·
936551 (1) ·
940050 (1) ·
940066 (1) ·
940142 (1)
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.25MI SOUTH OF SR-708 ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.5 Mile East of U.S 1 ' (1) ·
'0.51MI SOUTH OF SR-714 ' (1) ·
'0.5mi East of SR-786 ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'0.75 mi. E. of I-95 ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'1.0MI NORTH OF SR-708 ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.3 MI N OF STUART INTRCH' (1) ·
'2.2 MI SOUTH OF SR-76 ' (1) ·
'2.5MI NORTH OF CO LINE ' (1) ·
'2.6 MI NORTH OF SR-714 ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'3.4MI NORTH OF SR-714 ' (1) ·
'6 MI N OF PLM BEACH CO LI' (1) ·
'6.4 MI S OF INDIAN RVR CO' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-415 - Alamana Canal ' (1) ·
'SR-520 - Sykes Creek ' (1)
26322054 (1) ·
26422645 (1) ·
26500886 (1) ·
26501416 (1) ·
26554196 (1) ·
26562485 (1) ·
26591077 (1) ·
27012706 (1) ·
27022544 (1) ·
27033219 (1) ·
27043856 (1) ·
27060944 (1) ·
27091847 (1) ·
27102733 (1) ·
27113920 (1) ·
27121998 (1) ·
27162224 (1) ·
27222822 (1) ·
27300073 (1) ·
27390707 (1) ·
28212138 (1) ·
28212603 (1) ·
28555594 (1) ·
29064881 (1)
80040825 (1) ·
80041914 (1) ·
80090356 (1) ·
80095067 (1) ·
80111971 (1) ·
80112928 (1) ·
80134794 (1) ·
80142184 (1) ·
80142789 (1) ·
80145730 (1) ·
80162515 (1) ·
80180137 (1) ·
80184167 (1) ·
80184796 (1) ·
80193471 (1) ·
80195431 (1) ·
80213032 (1) ·
80225301 (1) ·
80230229 (1) ·
80344892 (1) ·
80404702 (1) ·
80432467 (1) ·
81012996 (1) ·
81063625 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)