Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL N. END LAKE IDA ' (1) ·
'CROOKED CREEK ' (1) ·
'Daytona Canal ' (1) ·
'Deep Creek ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-12 Canal ' (1) ·
'L-19 Canal ' (1) ·
'L-8 CANAL ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LWDD CANAL L-9 ' (1) ·
'LWDD L-5 CANAL ' (1) ·
'MIAMI CANAL ' (1) ·
'Turnbull Creek ' (1)
790086 (1) ·
794025 (1) ·
794081 (1) ·
795000 (1) ·
894014 (1) ·
930806 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1) ·
934214 (1) ·
934502 (1) ·
934519 (1) ·
935303 (1) ·
936262 (1) ·
936263 (1) ·
936264 (1)
'.3 mi South of Mason Ave ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3 Mile West of SR-A1A ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.5 MI S of FOREST HILL ' (1) ·
'1 MI S OF FOREST HILL BVD' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'2.3 Miles South of SR-40 ' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'6.3MI S of SoBay at US-27' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'US-1 NB - Turnbull Creek ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)