Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
News Link > SubTitle :
Facility to use water lettuce to absorb and remove dissolved nutrients from the North Relief Canal. or
Indian River Lagoon Appropriations Bills Introduced to Florida House or
Sebastian Inlet bridge set to be replaced in 2026
Use the filters below to narrow your results.
Florida District 52 Rep. Thad Altman (R) has introduced five appropriation bills totaling $5,321,500 to benefit the Indian River Lagoon National Estuary. (1) ·
Indian River County has received a $650,000 grant from the Florida DEP for construction of an Aquatic Plant System to remove nutrients from farm waters before discharge into the Indian River Lagoon. (1) ·
The 57-year-old bridge spanning the Sebastian Inlet to link the Brevard and Indian River barrier islands is set to be replaced in late 2026, according to the Florida Department of Transportation. (1)
Showing below up to 3 results in range #1 to #3.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)