Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
News Link > Region:
Other
& SubTitle :
Nearly 50 percent of the funding is dedicated to the Indian River Lagoon Watershed or
Sebastian Inlet bridge set to be replaced in 2026
Use the filters below to narrow your results.
$53M in funding has been designated for FDEP wastewater and sewer to septic conversion projects along the Indian River Lagoon. (1) ·
The 57-year-old bridge spanning the Sebastian Inlet to link the Brevard and Indian River barrier islands is set to be replaced in late 2026, according to the Florida Department of Transportation. (1)
Showing below up to 2 results in range #1 to #2.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)