Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
Dr. Peter Barile, "The Legislature and the governor should be vigilant in cutting wasteful spending projects such as muck dredging and “super clam” seed plantings that are not consistent with the FDEP’s restoration plans for the Lagoon." (1) ·
The 57-year-old bridge spanning the Sebastian Inlet to link the Brevard and Indian River barrier islands is set to be replaced in late 2026, according to the Florida Department of Transportation. (1) ·
With four major sources of Nitrogen pollution, restoration of the Indian River Lagoon is a complex issue. Every source must be addressed - It’s a classic “Yes And” Issue. (1)
Showing below up to 3 results in range #1 to #3.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)