Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
Dr. Chuck Jacoby, Chief Environmental Scientist, St. Johns River Water Management District, presented an Indian River Lagoon Water Quality Update to the Department of Environmental Protection IRL Basin Management Action Plan meeting on December 16, 2020. (1) ·
Sebastian Inlet Tax District (SITD) has posted a public notice announcing the closure of the North and South Jetties October 18 - 22, 2021 while engineers conduct an inspection of the structures. (1) ·
The 57-year-old bridge spanning the Sebastian Inlet to link the Brevard and Indian River barrier islands is set to be replaced in late 2026, according to the Florida Department of Transportation. (1) ·
The U.S. Army Corps of Engineers (USACOE) is now formulating a new operational schedule to manage the waters in Lake Okeechobee, and we must demand adoption of a new plan that will stop the discharges to the northern estuaries and send clean water south to the Everglades and Florida Bay. (1) ·
U.S. Army Corps of Engineers announces the approval of a planned deviation from Lake Okeechobee regulations to reduce risk from Harmful Algal Blooms. (1)
Showing below up to 5 results in range #1 to #5.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)